Page 154 - Minesite 2011

Basic HTML Version

Formas
ALTO
T:
1300 422 633
E:
info@formas.com.au
formas.com.au
Not allmine sites
are the same
Formas
ERGO
W440
Mine sites are different and so are their camp facilities.
In designing our Formas accommodation range, we made
flexibility a key ingredient.
Our sustainable modular living system can be configured
to solve any mining camp needs.
Formas ERGO can be externally stacked and linked to
suit any group dwelling design. They can be fitted with
complete sleeping, ablution, living and catering facilities
for the most challenging locations.
Formas
ERGO
TRANSPORTABLE
SUSTAINABLE
COST-EFFECTIVE
& SUSTAINABLE DESIGN
EXCELLENT
ENERGY-EFFICIENCY RATING
FULLY RATED UNIT ON
MEGA ANCHOR FOOTINGS
IN COMPLIANT LOADS
AUSTRALIA WIDE
MERCHANT PIG IRON (“MPI”) NUGGETS PRODUCED BY THE ITMK3® PROCESS
of Ferrowest and the Yalgoo iron project business plan.
“Producing a tonne of steel using the ITmk3®/electric arc furnace
production route will reduce greenhouse gas production by 30% compared
to the blast furnace/basic oxygen furnace route that currently dominates the
industry,” Mr Manning points out.
“Ferrowest’s adoption of this innovative technology puts us at the front of a
generational change in iron making that could materially reduce greenhouse
gas production in the steel industry. It is a shame that we have to pioneer real
reductions in greenhouse gases in the face of some very poor public policy
here in Australia that will do nothing to assist us in our endeavours, and
simply raises the cost bar further with a carbon tax.”
“The Yalgoo iron project will be successful because it marries innovative
thinking with a business plan targeting a niche market. We will continue
with our inventive drive to stay ahead of both market changes, and the
government’s efforts to reduce greenhouse gas emissions by taxation rather
than innovation” concluded Mr Manning.